Egyptian National Railway
Scope of work
The project includes the turnkey construction of 5 different technical buildings with various specifications; (4 typical buildings - 2 floors with area 464 m², distributed along the whole corridor from Bani Suef to Asyut)
In addition to CTC building consisting of 3 floors with an area of 2160 m² located in Menya City.
.jpg)
Construction, Architectural and Finishing Works
- Providing all Preliminary studies, including Geotechnical reports, structure and foundation designs and legalization
- Providing all the required concrete works necessary for the building structure including concrete filler block slab 30+10, column Unit, steel Stair and railing Unit
- Implementation of the sewage system and sanitation system
- Implementation of rain water drainage system
- Supply and installation of façade blocks concrete
- Supply and installation of Aluminum windows and ventilation grids
- Supply and installation of glass main entrances
- Implementation of all roof works including insulation and slops
- Implementation of all internal walls including internal partitions
- Supply and installation of a hot water production solar system
- Latex dust free and surface treatment to concrete floors, slabs or screeds
- Supply and installation of sound absorbing suspended ceiling
- Supply and apply of technical raised floor
- Cladding and painting works
- Supply and installation of all sanitary works and bathrooms fittings
- Supply and installation of all doors works including fire rated doors
Electromechanical works
- Supply and installation of HVAC systems including all accessories and fittings
- Supply and installation of fire protection and fighting systems including all accessories and fittings
- Supply and installation of all required High-Voltage works
- Protective grounding systems works and lightening system
- Supply and installation of all required low voltage works including UPSs, boxes, cables, distribution panels, lighting fixture, trays, and all types of required sensors